All demolition work requires a permit and must have approval from the Town Engineer.
Submittal Requirements
A site plan depicting all structures on the property and the location of demolition
Submittal Process
Plans may be submitted online electronically through the application.
Inspections Required
Sewer (if applicable)
Gas (Contact Carrier)
Electrical (Contact Carrier)
Final (Schedule an Inspection) To verify utilities are adequately capped and shut off. MUST BE COMPLETED BEFORE DEMOLITION BEGINS